Your Builder Wants a Progress Payment. So Where Does the Money Come From?
Most banks hand over a lump sum at settlement, which is useless when your builder invoices in stages, so construction lending works completely differently, and this page sets out exactly how, costs included.
Construction Loans We Arrange
Construction lending is not one product, and the right structure depends on what you own today and who holds the tools, so here are the six arrangements we organise most often locally:
Standard Construction
A standard construction loan funds a build on land you already own, with the lender releasing money in stages as your builder finishes each milestone, so you pay interest only on what has actually been drawn at any single point.
House and Land Packages
House and land packages split one purchase into two contracts, the land settling first and the construction contract following, which changes both your deposit timing and when duty becomes payable, so the structure needs checking before either contract is signed.
Knockdown Rebuild
Knocking down and rebuilding suits the plateau's 1960s brick homes well, because the blocks are generous and the older dwellings often carry little remaining value relative to the land, and lenders treat this differently from a renovation in several ways.
Vacant Land Then Build
Vacant land purchases in established Sydney suburbs are rare, so most local buyers considering this path look further afield, and the lending runs in two applications, one for the land itself and a fresh construction approval once plans are finalised.
Owner Builder
Owner builder lending is the hardest construction finance to place, because lenders see the completion risk sitting with an unlicensed amateur rather than a contracted professional, so expect a small panel, retained funds and, on many policies, a flat refusal.
Renovations Needing Council Approval
Major renovations needing council approval, common on these four-bedroom homes, can run through a construction loan where structural work exceeds renovation lending limits, while cosmetic jobs suit our home renovation loans instead, so always compare both carefully with us first.
How a Construction Loan Draws Down, Stage by Stage
Every dollar arrives through a drawdown, never as one lump sum, and the schedule below shows the pattern most lenders follow on a standard build, labelled as an illustration because each lender publishes its own stage percentages. Take a $1,000,000 construction limit: once the slab passes inspection your balance is $100,000, not the full million, and interest is charged on that balance alone. Early progress payments therefore feel cheap, final stages carry the heaviest interest, and a build that stalls at lock-up costs far less to carry than one stalled at fit-out. Some lenders also charge an inspection fee at every drawdown, so ask each lender to state its full schedule in writing before you choose, and we will put the structures side by side.
| Stage | Typical funds released | Running balance on a $1,000,000 loan |
|---|---|---|
| Slab down | 10% | $100,000 |
| Frame complete | 15% | $250,000 |
| Lock-up, roof and externals | 20% | $450,000 |
| Fit-out, kitchens and bathrooms | 35% | $800,000 |
| Completion and final inspection | 20% | $1,000,000 |
What Building Actually Costs You While It Runs
The rate gets all the attention, but monthly build costs depend on structure and timeline, so these are the four money questions to answer before signing anything. Households here earn a median of about $3,426 a week and most hold homes with four or more bedrooms, so local build budgets are serious, and carrying costs deserve equal seriousness.
Interest on Drawn Funds Only
During construction you repay interest only on the funds drawn so far, not the full approved limit, so a half-built house on a large approval costs roughly half the eventual monthly interest, which eases cash flow while the build runs.
Rent and Interest Together
If you own elsewhere and rent locally while building, you carry rent and drawn interest together, and with a median rent near $923 in this suburb, budgeting for both payments across an eight to twelve month build deserves honest arithmetic.
The Contingency Buffer
Every fixed price contract needs a contingency, commonly five to ten per cent of the contract price, held in cash or spare borrowing capacity, because variations and unforeseen site conditions arrive on nearly every job you run, straightforward or otherwise.
The Extended Build Bill
Builds that run longer cost more in three ways, extra interest on drawn funds, builder price escalation under delay clauses, and the rent you pay meanwhile, so a timeline with buffer months belongs in your budget from day one onward.
How it works
Our Construction Loans Process
Timelines matter when rent and a build run side by side, so rather than vague promises, here is what each stage of a typical application takes, in business days and weeks:
- 1
The First Meeting
Expect the first meeting to run about an hour, covering your own block, builder quotes, budget and deposit, and you leave with a written summary of the structures that fit, usually back within two business days of the meeting itself.
- 2
Documents and Checking
Formal documents, the signed build contract, plans, specifications and your financials, typically take three to five business days to gather and check, and this stage determines everything downstream, because an incomplete file sits in a lender queue just the same.
- 3
Assessment and Valuation
Once lodged, conditional assessment takes three to eight business days, then the lender orders a valuation on the plans and specifications, which adds a week, and any conditions or queries we answer with the lender directly rather than through you.
- 4
Approval to First Drawdown
Approval through to first drawdown spans two to four weeks, covering building contract verification, insurance confirmation and documentation, and the first progress claim can be lodged as soon as your builder reaches the slab stage and raises its first invoice.
- 5
Drawdowns Through to Completion
Each progress claim takes the lender one to two weeks to inspect and pay, and an eight month build with five claims typically settles across that span, with a final inspection on completion releasing the last funds to your builder.
Where Construction Loans Fall Over
Construction lending fails in predictable places, and nearly every failure traces back to a document signed before anyone checked the lending consequences, so these four traps are each avoidable with one conversation earlier:
Contract Variations
Fixed price contracts invite variations, and every one costs money the lender has not approved, so a kitchen upgrade signed mid build can push you past the approved limit, which means a fresh application, a new valuation and weeks waiting.
The Completion Valuation
Lenders value at completion, not at contract price, and if the finished house appraises below what it cost to build, the final drawdown can come up short, so we stress test your contract figures against local sales before you commit.
Builder Panel Checks
Some lenders will only fund builders registered on their own panel or holding current home building insurance, so a favourite small local builder can stall an otherwise smooth application, and we check this carefully before contracts are exchanged, not after.
The Expiry Date
Construction approvals carry expiry dates, commonly twelve months, and a build delayed past that point by weather, labour shortages or council matters needs an extension, which some lenders grant routinely and others treat as a fresh application with fresh fees.
Why Choose Your Mortgage Broker Killarney Heights
Choosing who arranges your construction finance comes down to verifiable facts rather than slogans, so here is what you get with Your Mortgage Broker Killarney Heights, each point documented in our Credit Guide and checkable before you commit:
A Named Accountable Broker
You deal with a named broker from first call to final inspection, someone whose licence number, credentials and licensee appear in writing here and in the Credit Guide, and who always answers the phone when the build throws a surprise.
A Panel, Not One Bank
Our licensee assembles a panel of lenders spanning major banks, smaller banks and non-bank construction specialists, and because construction policy varies enormously between them, we match your builder, contract type and timeline to the lenders most likely to approve it.
No Cost to Most Borrowers
For most borrowers our service costs nothing out of pocket, because lenders pay commission on settled loans, and we publish our fee and commission structure in writing so you can see what we earn and from whom, before anything proceeds.
Process Before Product
Conversations here start with your numbers rather than a product pitch, meaning deposit, income, contract price and timeline come first, and the lending structure follows from them, because the right loan for a knockdown rebuild is wrong for a renovation.
Where we work
Areas We Service
Based in Killarney Heights, we arrange construction finance across nearby suburbs, including Forestville, Allambie Heights, Seaforth, Castle Cove and Roseville Chase, with the same published process and named broker on every file.
Bring Your Build Contract to Us Before the Bank Locks Anything In
Before you sign the build contract, spend an hour checking the lending side, free and without obligation. Call Your Mortgage Broker Killarney Heights on (02) 9072 0649 or send your quotes through, and we will return real numbers within two business days.
Questions answered
Frequently Asked Questions
How much does it cost to use a broker for a construction loan?
For most borrowers nothing, because the lender pays commission on settlement, and we publish our fee and commission structure in writing so you can verify what we earn before any application proceeds.
How long does construction loan approval take?
From complete documents to formal approval typically runs three to five weeks, covering assessment, a valuation on the plans and contract verification, and the first drawdown follows once your builder finishes the slab and invoices for it.
Can I knock down and rebuild in Killarney Heights?
Yes, and the suburb suits it well, because most streets hold generous 1960s blocks where a new home replaces an older brick house, with funds released at each construction stage rather than paid in a single upfront sum.
What happens if the build costs more than the contract?
Variations beyond the approved limit need a fresh application and a new valuation, which costs weeks, so we recommend holding a contingency of roughly ten per cent of the contract price and telling your lender before signing any variation.
Do I pay interest on the whole loan during construction?
No, you pay interest only on the funds actually drawn, so a half-built project on a large approval costs roughly half the eventual monthly interest, and repayments step up gradually as each stage is paid.
Do you work with owner builders?
Occasionally, but it is the hardest construction finance to place, because lenders see completion risk sitting with an unlicensed amateur, so expect fewer options, tighter supervision of funds and, on many policies, a flat refusal.